Bridge construction activities: NYS Route 89 Bridge (E-91) over the Erie Canal near Lock 25 Mays Point.
05/11/2015 12:45 PM
Notice to Mariners
Erie Canal – Town of Tyre
May 11, 2015
Mariners are advised of bridge rehabilitation activities on the Rte. 89 Bridge (E-91) over the Erie Canal, immediately west of Lock E25 Mays Point. At times the width of the channel will be reduced, and there may be occasional delays. Construction is expected to take place now through the 2015 navigation season.
The speed limit is 5 mph in all work zones.
Chart 14786 E-4 covering the affected area can be found at 14786e04.webp.
Features along the western portion of the Erie Canal are listed by mileage at /Navigation-Information.
For updates and information, please call 1-800-4CANAL4 or visit Canals.NY.gov.