Notice
Bridge rehab: Erie Canal Bridge E-115 Galloway Rd. Clearance Change
Notice to Mariners
Erie Canal – Town of Palmyra
July 11, 2019
Reissued with overhead clearance correction
Mariners are advised that bridge repair and painting activities are scheduled to begin on July 15th to the end of the navigation season for Erie Canal Bridge E-115 Galloway Road over the Erie Canal. The overhead clearance of this bridge will be reduced to 17’7” with signs posted on both sides of the bridge.
Mariners should reduce speed, stop all forward motion, and proceed at a "No-Wake" speed when traversing this area.
NYSCC Cruising Guide Page E-21 showing the affected area can be found at nyscce21.webp
Features along the western portion of the Erie Canal are listed at /Navigation-Information
For updates and information, please visit Canals.NY.gov or follow us on Facebook or Twitter