Bridge repair/rehab: Erie Canal Bridge E115 Galloway Road

07/11/2019 09:21 AM

Notice to Mariners

Erie Canal – Town of Palmyra

July 11, 2019

Mariners are advised that bridge repair and painting activities are scheduled to begin on July 15th to the end of the navigation season for Erie Canal Bridge E-115 Galloway Road over the Erie Canal.  The overhead clearance of this bridge will be reduced to 15’8” with signs posted on both sides of the bridge.

Mariners should reduce speed, stop all forward motion, and proceed at a "No-Wake" speed when traversing this area.

NYSCC Cruising Guide Page E-21 showing the affected area can be found at nyscce21.webp

Features along the western portion of the Erie Canal are listed at /Navigation-Information

For updates and information, please visit Canals.NY.gov or follow us on Facebook or Twitter